In accordance with the City of Prattville’s current NPDES Permit, the City has developed a Post Construction Stormwater Program to address stormwater runoff from qualifying new development and re-development projects. These requirements will become effective on October 5, 2018.

Under these requirements, it will be necessary for any site which uses structural BMPs to control stormwater runoff to obtain a Post-construction Stormwater Permit. Complete details of what is required can be found in the Post Construction Stormwater Permit Package links shown below.

The Technical Memorandum link shown below provides technical guidance regarding these updated post-construction stormwater management requirements in accordance with the City’s NPDES Permit. The Post Construction Permit Packet Instructions contain step-by-step details concerning the City’s entire Post Construction process. Please use the links below to download copies, forms, and details to be used in this program. 

 

 
 

STORMWATER FORMS:


Prattville Waiver Forms

  • Form 1A – Existing Development Waiver Request Form
  • Form 1B – Redevelopment Impervious Area Waiver Request Form
  • Form 1C – Regional Stormwater Management Waiver Request Form
  • Form 1D – Non-Qualifying Development Waiver Request Form
  • Form 1E – Special Residential Waiver Request Form

Prattville Detention Pond Forms

  • Form 2A.1 – Detention Pond Design Form
  • Form 2A.2 – Detention Pond Design Form Attachment
  • Form 3A – Detention Pond As-Built Certification Form

Prattville Retention Pond Forms

  • Form 2B.1  Retention Pond Design Form
  • Form 2B.2 – Retention Pond Design Form Attachment
  • Form 3B – Retention Pond As-Built Certification Form

Prattville Underground Detention Pond Forms

  • Form 2C.1 – Underground Detention Design Form
  • Form 2C.2 – Underground Detention Design Form Attachment
  • Form 3C – Underground Detention As-Built Certification Form

Prattville Bioretention Area Forms

  • Form 2D.1 – Bioretention Area Design Form
  • Form 2D.2 – Bioretention Area Design Form Attachment
  • Form 3D – Bioretention Area As-Built Certification Form

Prattville  Hydrodynamic Separator Forms

  • Form 2E – Hydrodynamic Separator Design Form
  • Form 3E – Hydrodynamic Separator As-Built Certification Form

Prattville  Permeable Pavement Forms

  • Form 2F – Permeable Pavement Hydrodynamic Separator Design Form
  • Form 3F – Permeable Pavement As-Built Certification Form

Prattville Annual Inspection Forms

  • Form 4A – Detention Pond Annual Inspection Form
  • Form 4B – Retention Pond Annual Inspection Form
  • Form 4C – Underground Detention Annual Inspection Form
  • Form 4D – Bioretention Area Annual Inspection Form
  • Form 4E – Hydrodynamic Separator Annual Inspection Form

Prattville 5A HOA Escrow Account/ Maintenance Request Form

  • Form 5A – HOA Escrow Account/Maintenance Request Form

Prattville 2.3 Additional Basins

Post Construction Stormwater Operation and Maintenance Agreement

Regional Detention Stormwater Operation and Maintenance Agreement

Post Construction Maintenance Escrow Agreement

Post Construction Stormwater Management Ordinance

 

 

Contact:

Jonathan Larkin
Assistant Director

Public Works

Hours:

  • 7:00 a.m. - 4:00 p.m.

Quick Links